Fill out your details below to instantly download your brochure.
Heat Pump:Commercial GSHP 2 x 40kW Nibe F1345’s
Heat Source:Underfloor Heating and Fan Heaters
:Vine House Farm Shop, Spalding
Heat Pump:10x 5kW Mitsubishi Ultraquiets
Heat Source:Underfloor Heating
:10 x flats Nottingham
Heat Pump:8.5kW Mitsubishi Ultraquiet ASHP
Heat Source:GHGS
:Retro Fit with New Radiators, Nottingham
Heat Pump:GSHP and ASHP
Service:Multiple New Builds with Underfloor Heating
Heat Pump:2 x NIBE Ground Source 6kW Heat Pumps
Ground Loop:600M
Trenching:300M
Heating Demand:44,000kWh
Biomass Boilers - Newark:X6 Herz 199kW Firematics
Biomass Boilers - Girton:X6 Herz 199kW Firematics
Biomass Boilers - North Clifton:X6 Herz 199kW Firematics
Fuel:Woodchip
Biomass Boilers - North Scarle:X6 Herz 199kW Firematics
Biomass Boilers - Killingholme:X8 Herz 199kW Firematics
Biomass Boilers - Woodhall Spa:X4 Herz 199kW Firematics
Biomass Boilers:Herz 995kW Biofire & Herz 250kW Firematic
Demand:1,338,172kWh
CO2 Emmissions:Saved over 1000 tonnes
Savings in Heating and Maintenance per Year:Over £30,000
Biomass Boiler:Herz Firematic 501kW
Demand:667,200 kWh
Previous Fuel:Gas
Projected Annual RHI:£30,000
Biomass Boiler:199kW ETA Hack Wood Chip System with Direct Heat Main
CO2 Savings per Year:79 Tonnes
Fuel Saving per Annum:£8,750
Projected RHI Payment per Annum:£7,498.80 for 20 years
Heat Pump:Non-Domestic 80kW NIBE Ground Source Heat Pump with oil back-up
Property area:House1 280M²/House2 180M²/Office 120M²/Workshop 288M²
Existing fuel:Oil
Heating Demand:112,000kWh
Heat Pump:Non-Domestic 60kW NIBE Ground Source Heat Pump
Swimming pool:Complete installation, tiled and sealed
Property area:House 1 320M²/Office 86M²/Swimming Pool 96M²
Heat Pump:Nibe F1345 40kW 3 phase Ground Source Heat Pump
Heating Demand:57,816kWh
Collector:1500M Ground Loop
RHI:Estimated at £5,255.47 per year over 20 years
Biomass Boiler:301kW Herz Firematic
Previous Fuel Source:LPG and electric
Current Heat Usage:185,000kWh’s
Fuel Type:Wood pellet
Biomass Boiler:499kW Herz Firematic
Previous Fuel Source:Oil
Current Heat Usage:664,700kWh’s
Fuel Type:Wood Chip
Biomass Boiler:349kW Herz Firematic
Previous Fuel Source:Mains Gas and Oil
Current Heat Usage:460,000kWh’s
Biomass Boiler:Herz Firematic 60kW
Projected RHI Payment per Annum:£6,500.00
Biomass Boiler:Herz 300kW Firematic
Current Heat Usage:500,000kWh
Biomass Boiler:Herz 60kW Firematic
Previous Fuel Source:Solid Fuel
Fuel Type:Woodchip
Heating Demand:79,000kWh
Why not find out what a new renewable heating system might cost to install in your home or business.