Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Saint Gobain Formula, Newark

Project

Saint Gobain Formula Carbon Reduction Scheme

Project brief

To reduce the carbon emission from the Office Block at Saint Gobain Formula

JL Phillips' solution

Removal of existing gas fired boilers, Applying upgrades to the internal heat emitters and controls. Installing three Mitsubishi CAHV Air Source Heat Pumps

Following the initial enquiry, J L Phillips carried out a full room by room heat loss calculation on the Office block This determined the room requirement for space heating in Watts per m2. Radiator sizing was designed to ensure that the temperature of each room (21 degree Centigrade) was achievable at an external temperature of – 3 degrees Centigrade.

Heat pump sizing was achieved by calculating the total watts required for space heating with an additional hot water requirement for the 15 showers in the changing room block.Third party heating controls were installed, and a split zone design was implemented to separate the shower block from the office block and split the ground floor from the first floor.

3 x Mitsubishi CAHV 42kW Monoblock heat pumps were specified, giving a total output of 126kW’s.

With a seasonal coefficient of performance up to 3.54. The installation and upgrades to the heating design will look to save not only on carbon emission but also on-going fuel bills.

Client feedback

Initial feedback following the commissioning was very positive.

The heat pumps were sited 15M from the plant room and wooden fencing was erected around the plinthed area. The initial concerns over noise levels were quickly dispelled, with no adverse reports from the office staff. The installation was commissioned in February. The new heat emitters and controls enabled the staff to have not only very comfortable levels of heat, but also allowed more control at the radiators via TRV’s.

The zone controls enabled Saint Gobain’s Maintenance Team to tailor the timing functions to suit the staffing levels therefore reduce the run times and increase the efficiency of the system.

Overall, a very effective application of heat pump technology.