The customer required an alternative heating system for manufacturing process heat and space heating at their factory near Kirmington. It was essential that a stable heat source was provided, so a back-up LPG boiler was installed to be called upon in the event of biomass boiler down time.
With future development in mind we advised the installation of a 301kW Herz Firematic with an 8,000ltr buffer running at a high 85-degree temperature to suit the manufacturing processes.
To ensure that project timelines were achieved and a minimum of disruption occurred, the biomass and LPG boiler plant room was built within a purpose made container off site at our manufacturing area. The pellet store was supplied by Collinson days before the biomass container, with the connections and commissioning taking just 7 days to complete.
This particular project went very smoothly, as is often the case when a plant room is manufactured at our base in Newark, then delivered ready for connection to pre-prepared heating systems. J L Phillips have the capability to manufacture biomass containerized systems up to 999kW’s in size, with built in buffering and in some cases, built in wood chip or wood pellet stores.