Elsham Hall

Elsham Hall

The land agent was looking at reducing the heating costs for the Hall, tenanted buildings and offices, as well as providing an uplift in the heating capacity due to the limited size of the existing gas main. As the estate had the capability of producing its own...
Farm, Epperstone

Farm, Epperstone

The customer required a large biomass heating system to provide heating for his chicken shed and 3 domestic properties. The Herz Firematic 300kW boiler was chosen as the peak heating load for the chicken shed and domestic properties required significantly greater than...