Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Deene Park

The land agent was looking at reducing the heating costs for the Hall, tenanted buildings and offices, as well as providing an uplift in the heating capacity due to the limited size of the existing gas main.

As the estate had the capability of producing its own woodchip a 350kW Herz Firematic wood chip boiler with a 5,000ltr buffer was specified to provide the heat, with a back-up gas boiler connected to the buffer and metered for ineligible incentivised heat production.

A plant room was constructed within an existing farm building, with a new wood chip store constructed to the side of it. A district heat main was installed to carry the heat between the buildings, with a variable speed, temperature controlled shunt pump providing the heating control to each of the buildings.

J L Phillips designed, specified and installed the project within criteria set out by the client, the boiler is now providing heat to all buildings with the back-up boiler automatically engaging during maintenance, down time and wood chip fills.

More news from JL Phillips

The Benefits and Challenges of Biomass Boiler Installation

Today, more people are turning to eco-friendly and cheaper ways to help save the environment. For this specific reason, Biomass Boilers are becoming more popular. However, installing a biomass boiler offers both advantages and challenges that require careful...

Exploring the Advantages of Air Source Heat Pump Systems

Nowadays, air source heat pumps are being acknowledged as a sustainable yet affordable choice for both commercial and residential indoor temperature systems. These advanced systems consistently provide heating and cooling, appealing to eco-minded individuals seeking...

What Are The Top 5 Advantages of Underfloor Heating Systems

When considering home heating solutions, underfloor heating systems are considered a luxury but it is actually its practicality, efficiency, comfort, and modern appeal. In this article, we delve into the top five advantages of...

Heat Pump Guide

Choose The Right Heat Pump For Your Home So, What are they and how do they work? What is an air source heat pump? An air source heat pump (ASHP) is used to provide a home with heating and hot water. An ASHP absorbs heat from outside air in the same way that a fridge...